Property How Much © 2023
Compare 15 private properties (Condos and ECs) by PSF, leasehold, and age within 2km walking distance from Chinatown. Prices of properties in this area average $1350 per square foot. Chinatown is a interchange connecting Downtown Line and North East Line. Use our lists to make the best informed decisions and narrow down your search for the right property.
The Downtown Line (DTL) is an underground, driverless MRT line that connects the North-Western and Central-Eastern regions with the new downtown area. It will be approximately 44 km long with 36 stations, running from Bukit Panjang (DT1) to Sungei Bedok (DT37) via Downtown (DT17).
Currently, 34 stations are open for passenger service, from Bukit Panjang (DT1) to Expo (DT35). Hume Station (DT4) is currently a shell station and will open in 2025 after being refitted.
A future extension, known as the Downtown Line Stage 3e, will extend the line from Expo to Sungei Bedok (DT37) via Xilin (DT36) and is set to open in 2025. This extension will connect with the Thomson-East Coast Line and the future East Coast Integrated Depot, which will accommodate trains from the East West Line, Thomson-East Coast Line, and Downtown Line on different levels.
Another future extension, the Downtown Line Stage 2e, will extend the line from Bukit Panjang to Sungei Kadut and is scheduled to open in the mid-2030s as part of the Land Transport Master Plan 2040.
The North East Line (NEL) is a driverless and high-capacity MRT line in Singapore. It is underground and runs from Central Singapore to the North East regions. The line is 19.2km long and has 16 stations, starting from HarbourFront (NE1) and ending at Punggol (NE17). It was the first fully automated underground heavy rail line in the world when it opened and uses a radio-based CBTC signalling system. The rolling stock operates in six-car formations and is based at the Sengkang Depot. By 2024, the North-East Line extension (NELe) will add an additional station (NE18 Punggol Coast) in the Punggol Downtown area. This extension was brought forward by 6 years from the original 2030 plan.